<font id="jkako"><sup id="jkako"></sup></font>

      1. <progress id="jkako"><menuitem id="jkako"><ins id="jkako"></ins></menuitem></progress>

        WE

        INNOVATE

        NOW

        Contact us: info@shanxiwin.com


        Warmly congratulate the consortium of WIN&SEPEC on jointly signing of Package No.2—Coal Handling System for Vinh Tan 4 TPP 2x600MW

         

        On Feb 7th ,2015, the signing ceremony of Package No.2Coal Handling System for Vinh Tan 4 TPP 2x600 MW was held in Hanoi, Vietnam which by  the consortium of WIN&SEPEC jointly signed with PECC2 who is the affiliate of EVN.  MS Jane as the representative of WIN in Vietnam, Mr. Xinping Wang as the Deputy General Manager of SEPEC and Mr. Nguyen Chon Hung as the General Manager of PECC2 signed on the contract respectively.

        Vinh Tan 4 TPP 2x600MW located in Southern Vietnam --Binh Thuan province, invested and built by EVN and EPC Consortium Contractors are Doosan, Mitsubishi, PECC2 and PC.

         WIN successfully signed Package No.2Coal Handling System for Vinh Tan 4 TPP 2x600 MW and thus add to superlative record in targeting at Vietnamese market, covering the Southeast Asian market with surrounding energy-oriented.

         

         

        男人天堂av